How to Import a Truck from China

Updated 2026-11-05 · 10 min read · by Hymiray

Quick answer

Importing a truck from China is a process, not a purchase. The truck is the easy part; the part that goes wrong is almost always one of these four: the wrong emission standard for your country, a chassis and a crane/body built to different specs, missing export documents, or a shipping method that cannot carry the vehicle.

Plan for 6–10 weeks end to end: production 20–45 days, sea freight 20–50 days depending on route, plus customs clearance at destination.


1. The 8 steps, in order

#StepWho does itTypical time
1Confirm the spec that is legal in your country (emission, LHD/RHD, axle load, lighting)You + your customs broker1–3 days
2Get quotations against a written spec sheet2–4 suppliers3–10 days
3Verify the supplier (licence, factory, past exports)You2–5 days
4Sign contract: spec, price, Incoterm, warranty, penalty for late deliveryBoth1–3 days
5Deposit (commonly 30%) and productionFactory20–45 days
6Pre-shipment inspection (photos/video of the actual unit + VIN + plate)You or a third party1–3 days
7Booking, loading, export declarationYour forwarder3–10 days
8Sea freight, arrival, import clearance, registrationForwarder + broker20–50 days at sea
The most expensive mistake in this table is step 1. Emission standard and steering side cannot be changed after the chassis is ordered, and a truck that cannot be registered is worth scrap value in your market.

2. How the vehicle actually ships

MethodWhat it suitsAdvantagesWatch out for
RoRo (roll-on/roll-off)Running trucks, self-propelled unitsCheapest per unit; no packingFixed sailing schedule; the unit must start and drive; not for trailers or non-runners
Container (40HQ)Small trucks, vans, pickups, partsFrequent sailings, easy consolidationHeight/width limits; a 4.2 m light truck usually fits after wheel/body adjustments — confirm dimensions first
Flat rack / open topOversize trucks, cranes, trailers, machineryNo dismantlingHigher freight; lashing plan is critical
Break bulkVery large or multiple unitsFlexibleSlow, port-dependent

Lashing is not a detail. Ask your forwarder for the lashing plan for cranes and high-CG vehicles, and photograph the unit after loading.


3. Documents you will be asked for

DocumentIssued byNeeded for
Commercial invoice + packing listSupplierEverything
Bill of Lading (B/L)Shipping lineRelease of goods
Certificate of Origin (CO)CCPIT / chamberDuty preference if your country has an FTA
Form E (ASEAN–China FTA)CCPITReduced duty in ASEAN countries
Emission / conformity certificateChassis manufacturerRegistration
MIIT announcement (公告) copyManufacturerHomologation in some markets
CCC certificateManufacturerSome markets require it for the vehicle/body
Insurance certificateInsurerCargo risk
Pre-shipment inspection report (if required)Third-party inspectorSome destinations mandate it (e.g. SONCAP, PVoC)
Pre-shipment conformity programs (SONCAP in Nigeria, PVoC in Kenya/Tanzania, COC in Saudi Arabia, etc.) require inspection before loading. If you discover the requirement after the container sails, you will pay for it twice.

4. HS codes you will see on the paperwork

CodeCovers
8704Goods vehicles (pickups, light/medium/heavy trucks, tippers)
8705Special purpose vehicles (cranes, concrete pumps, fire trucks, sweepers, wreckers)
8701Tractors (road tractors for semi-trailers)
8716Trailers and semi-trailers
8708Parts and accessories

The body builder's invoice often lists the chassis under 8704 and the body/crane under 8705 or 8708. Mismatched codes between invoice, B/L and customs declaration are one of the most common clearance delays — ask for one consistent description.


5. What the total cost includes

Do not compare "truck price" alone. Budget these lines:

  1. Unit price (ex-works) — what suppliers usually quote;
  2. Inland transport in China to the port;
  3. Export declaration / port charges;
  4. Ocean freight (+ war risk, BAF where applicable);
  5. Marine insurance (typically a small percentage of CIF value — ask for the quote);
  6. Destination port charges (THC, doc fees, demurrage if you are slow);
  7. Import duty + VAT based on HS code and your country;
  8. Customs broker fee;
  9. Registration / homologation / plating in your country;
  10. Contingency for modifications found during inspection.
A quotation that says "FOB Shanghai USD X" is a starting point, not a landed cost. Ask each supplier for a pro-forma invoice with the Incoterm written out (FOB / CIF / CFR / DAP / DDP) — the difference between CIF and DDP can be 25–40% of the total.

6. Six mistakes that cost the most

  1. Ordering China VI when your country registers Euro 3 (or the reverse) — the truck arrives and cannot be plated.
  2. Trusting a spec sheet instead of a plate photo — the crane or engine model on the plate is the one that exists.
  3. Skipping the pre-shipment inspection — photos of a different unit are common; ask for the VIN and the crane serial in the same frame.
  4. One invoice description, another on the B/L — customs will stop it.
  5. No lashing plan for cranes — a truck-mounted crane that shifts in heavy weather writes off the shipment.
  6. Paying 100% up front to a trading company you have not verified — use a deposit plus inspection-linked balance.

7. What to send a supplier (copy this)

1. Truck type and body: ______ (tipper / crane / tanker / refrigerated / other)
2. Emission standard required for registration in ______: ______
3. Steering: LHD / RHD; road regulations: ______
4. Destination port and country: ______
5. Preferred Incoterm: FOB / CIF / CFR / DAP / DDP → ______
6. Required documents (CO / Form E / SONCAP / PVoC / COC…): ______
7. Please quote: unit price, inland transport, export charges, freight, insurance, and total landed estimate
8. Please attach: chassis VIN, engine model, emission certificate, and a plate photo of the actual unit

8. Where to look next

Frequently asked questions

+What is the cheapest way to ship a truck from China?

For a running truck, RoRo (roll-on/roll-off) is usually the cheapest per unit, followed by a shared 40HQ container for small trucks and vans. Oversize or non-running units need a flat rack or break bulk, which costs more. Freight also depends on the route and the sailing schedule, so always compare a full quote including port charges at both ends.

+How long does it take from order to delivery?

Typical total is 6 to 10 weeks: production of 20 to 45 days depending on chassis availability and body complexity, plus 20 to 50 days of sea freight depending on destination, plus customs clearance. Ask for a written production schedule with the deposit invoice, and add buffer for the sailing date.

+Which emission standard should I order?

The one your country will register. China VI is standard for the domestic Chinese market; export units are commonly built to Euro 3, Euro 5 or Euro 6, and some destinations require EPA or a local homologation. Confirm with your customs broker or registration authority before the chassis is ordered, because it cannot be changed afterwards.

+Do I need a pre-shipment inspection?

Many destinations require a conformity inspection before loading (for example SONCAP in Nigeria, PVoC in Kenya and Tanzania, or a COC in Saudi Arabia), and even where it is not mandatory it is the cheapest protection you can buy: it confirms the VIN, the crane or body serial, the emission label and the actual condition before you pay the balance.

+What should the contract include?

The written specification (model, crane or body type, emission, steering), unit price and Incoterm, payment schedule tied to inspection, delivery window with a late-delivery penalty, warranty terms separated for chassis and body, and the spare-parts list. Vague contracts are the main reason disputes cannot be resolved.